Pumped-Storage Hydropower Plant
This pumped-storage hydropower project combines caverns, tunnels and shafts with demanding geological and construction interfaces. The reference connects geotechnical and hydrogeological expertise with environmental supervision and the management of excavated material.
- Scope
- Environmental and construction supervision; tunnel excavation spoil management; geotechnical documentation and consulting; investigation planning; hydrogeological reporting.
- Client
- EnBW
- Reference period
- 2010–2027
- Reported construction value
- Approx. EUR 300 million
Underground construction context
Pumped-storage hydropower plants require coordinated planning and supervision across tunnelling, geotechnics, hydrogeology, structural works, excavation logistics and environmental requirements. The underground setting demands continuous documentation, monitoring and close coordination throughout construction.
Integrated delivery approach
The project combines geotechnical and hydrogeological expertise with environmental and construction supervision. Continuous coordination supports safe underground construction, compliant material management and reliable delivery across complex cavern, shaft and tunnel sections.
This reference represents experience of companies and specialists within the TEAMPLAN FGM partner network.