Mushrif Water Reservoir
The Mushrif Water Reservoir project combines large-scale reinforced-concrete water storage with pipeline connections, drainage and associated site infrastructure. The reference covers design-and-build delivery across these closely connected construction disciplines.
- Scope
- Design-and-build construction; reinforced-concrete reservoir works; pipeline construction; infrastructure and drainage systems.
- Client
- DEWA
- Reference period
- 2008–2011
- Reported construction value
- Approx. EUR 180 million
- Capacity
- Approx. 820 million litres
Water infrastructure context
Large-capacity reservoirs require coordinated design and construction across structural engineering, hydraulic systems, pipeline connections, drainage, waterproofing and site infrastructure. Careful interface management is essential to ensure operational reliability, durability and efficient integration into the wider water network.
Integrated delivery approach
The project integrated structural construction, water infrastructure, pipeline works and drainage systems within a coordinated design-and-build delivery model. This approach supported efficient execution of the reservoir and its associated site and network interfaces.
This reference represents experience of companies and specialists within the TEAMPLAN FGM partner network.



